S GREEN ST over WADE CREEK

0.01 MI S OF TIMPSON ST · County 183, Texas · Built 1998 · 4 Lanes · 24,002 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
100930E00428002
Year Built
1998
Reconstructed
2016
Length
6.4 m (21 ft)
Max Span
3 m
Width
17.4 m (57.1 ft)
Lanes
4
Daily Traffic
24,002
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$136,000
Total Project Cost
$152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.