FM 2206 over HAWKINS CREEK

1.25 MI NE OF SH 42 · County 183, Texas · Built 2023 · 2 Lanes · 4,203 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100930207301003
Year Built
2023
Length
210.3 m (690 ft)
Max Span
36.6 m
Width
26.2 m (86 ft)
Lanes
2
Daily Traffic
4,203
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.