FM 2087 over BULLHIDE SLOUGH

1.05 MI N OF IH 20 · County 183, Texas · Built 1956 · 2 Lanes · 2,367 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
100930193101001
Year Built
1956
Length
30.5 m (100.1 ft)
Max Span
7.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
2,367
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.