FM 449 over PANTHER CREEK

3.25 MI SE OF US 259 · County 183, Texas · Built 1964 · 2 Lanes · 1,656 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
100930064007022
Year Built
1964
Length
27.7 m (90.9 ft)
Max Span
9.1 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
1,656
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,000
Total Project Cost
$54,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.