CR 1226 over Ioni Creek
3.6 Mi N of SH 294 · County 001, Texas · Built 2019 · 1 Lanes · 49 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
31.661331, -95.3545
This bridge is in worse condition than 36.7% of bridges in County 001. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
SH 294 over IONI CR
Built 1990
FM 323 over SQUIRREL CREEK
Built 1955
CR 1206 over IONI CREEK
Built 2008
CR 1225 over NECHES RIVER
Built 1986
SH 294 over NECHES RIVER
Built 1986
SH 294 over BROWN BRANCH
Built 1946
FM 323 over TURKEY CREEK
Built 1955
FM 228 over RICH CREEK
Built 2002
FM 2022 over SADDLER CREEK
Built 1959
CR 1765 over Rich Creek
Built 2017
Bridge Details
- Structure #
- 100010AA1226201
- Year Built
- 2019
- Length
- 27.1 m (88.9 ft)
- Max Span
- 15.5 m
- Width
- 4.6 m (15.1 ft)
- Lanes
- 1
- Daily Traffic
- 49
- Material
- Steel
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.