HILLSIDE DRIVE over CASTLEMAN CREEK

1.60 MI N OF FM 2837 · County 309, Texas · Built 1996 · 2 Lanes · 287 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
091610K00245001
Year Built
1996
Length
7 m (23 ft)
Max Span
3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
287
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$167,000
Total Project Cost
$208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.