BAYS ROAD over TEHUACANA CREEK
0.03 MI NE OF N PLEASANT · County 309, Texas · Built 2020 · 2 Lanes · 32 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.659986, -97.025683
This bridge is in worse condition than 39.1% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
SH 31 over TRIB. OF WILLIAMS CREEK
Built 2012
SOLITUDE LANE over POST OAK CREEK BRANCH
Built 2009
US 84 WB over SH 31
Built 1977
US 84 over Trib of Williams Creek
Built 1931
SH 31 WB over FM 1330
Built 2012
SH 31 EB over FM 1330
Built 2012
US 84 over Branch of Williams Creek
Built 1931
LINCOLN CITY ROAD over POST OAK CREEK
Built 2005
US 84 WB over TEHUACANA CREEK RELIEF
Built 1931
MAEHR ROAD over TEHUACANA CREEK TRIB
Built 2016
Bridge Details
- Structure #
- 091610AA0708001
- Year Built
- 2020
- Length
- 22.9 m (75.1 ft)
- Max Span
- 22.9 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 32
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.