AYCOCK LANE over MANOS CREEK TRIBUTARY

0.50 MI SE OF SH 164 · County 309, Texas · Built 1974 · 2 Lanes · 72 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
091610AA0653001
Year Built
1974
Length
18.6 m (61 ft)
Max Span
9.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
72
Material
Prestressed Concrete
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000
Total Project Cost
$375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.