FM 2837 over TRIB OF BULLHIDE CREEK

3.5 Mi E of IH 35 · County 309, Texas · Built 1965 · 2 Lanes · 1,372 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
091610286801005
Year Built
1965
Length
8.8 m (28.9 ft)
Max Span
2.4 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
1,372
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.