SH 6 (LP 340) over Trib Cottonwood Creek
0.3 Mi E IH 35 · County 309, Texas · Built 1963 · 8 Lanes · 15,393 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
31.491319, -97.146672
This bridge is in worse condition than 39.1% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
SH 6/LP 340 WBML over IH 35
Built 2006
SH 6/LP 340 EBML over IH 35
Built 2006
SH 6/ LP340 WBFR over IH 35
Built 2006
SH 6 /LP 340 EBFR over IH 35
Built 2006
IH35 NB to SH6 WB over IH 35 & SH 6/LP 340
Built 2012
LP340EB-IH35NBConn over IH 35 & LP 340(SH 6)
Built 2007
SH 6 over COTTONWOOD CREEK TRIB
Built 2007
IH 35 over N Flat Creek
Built 2011
SH 6 SB (LP 340) over OLD ROBINSON ROAD
Built 2018
SH 6 NB (LP 340) over OLD ROBINSON ROAD
Built 2018
Bridge Details
- Structure #
- 091610025809083
- Year Built
- 1963
- Reconstructed
- 2016
- Length
- 10.4 m (34.1 ft)
- Max Span
- 2.1 m
- Lanes
- 8
- Daily Traffic
- 15,393
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $200,000
- Total Project Cost
- $400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.