SH 6 (LP 340) over Trib Cottonwood Creek

0.3 Mi E IH 35 · County 309, Texas · Built 1963 · 8 Lanes · 15,393 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
091610025809083
Year Built
1963
Reconstructed
2016
Length
10.4 m (34.1 ft)
Max Span
2.1 m
Lanes
8
Daily Traffic
15,393
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.