SH 6 over Davis Branch

3.6 Mi SE of FM 185 · County 309, Texas · Built 1963 · 8 Lanes · 12,945 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
091610025809073
Year Built
1963
Length
17.1 m (56.1 ft)
Max Span
2.7 m
Lanes
8
Daily Traffic
12,945
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.