SH 6 SB over LAKE WACO
2.9 MI NW OF US 84 · County 309, Texas · Built 1963 · 2 Lanes · 13,212 vehicles/day
Overall
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
31.531044, -97.238064
This bridge is in worse condition than 66% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
SH 6 NB over LAKE WACO
Built 1963
ESTATES DRIVE over PORTERS BRANCH
Built 1989
BOSQUE BLVD over DRAW
Built 1990
SH 6 NB over Loop 396
Built 1963
SH 6 SB over Loop 396
Built 1963
SAN ANN ROAD over DAVIS BRANCH
Built 1972
WEST FAIRWAY DRIVE over POTTERS BRANCH
Built 1990
SH 6 over Davis Branch
Built 1932
SH 6 over Trib Davis Branch
Built 1932
SAN ANN ROAD over SPEEGLEVILLE CREEK
Built 2022
Bridge Details
- Structure #
- 091610025809068
- Year Built
- 1963
- Length
- 1195.7 m (3922.9 ft)
- Max Span
- 22.6 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 13,212
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $14,300,000
- Total Project Cost
- $22,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.