US 84 EB over TEHUACANA CREEK RELIEF

1.2 MI SW OF SH 31 · County 309, Texas · Built 1979 · 2 Lanes · 7,796 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
091610016201079
Year Built
1979
Reconstructed
2002
Length
92.4 m (303.1 ft)
Max Span
9.1 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
7,796
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,100,000
Total Project Cost
$1,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.