US 84 over Trib of Williams Creek

4.4 Mi E of SH 31 · County 309, Texas · Built 1931 · 2 Lanes · 5,093 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
091610005601008
Year Built
1931
Reconstructed
2006
Length
10.1 m (33.1 ft)
Max Span
3 m
Width
26.3 m (86.3 ft)
Lanes
2
Daily Traffic
5,093
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.