US 84 WB over POAGE DR

1.1 MI W OF FM 1695 · County 309, Texas · Built 1995 · 2 Lanes · 11,824 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
091610005508071
Year Built
1995
Length
91.4 m (299.9 ft)
Max Span
30.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
11,824
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,100,000
Total Project Cost
$1,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.