US 84 EB over Texas Central Pkwy

1.1 Mi W of SH 6 · County 309, Texas · Built 1986 · 2 Lanes · 26,038 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
091610005508069
Year Built
1986
Length
82.3 m (270 ft)
Max Span
35.4 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
26,038
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.