IH 35 SB FR over UP RR
0.6 MI N OF BRAZOS RI · County 309, Texas · Built 2018 · 3 Lanes · 26,960 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.564708, -97.117175
This bridge is in worse condition than 39.1% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
IH 35 SBML over UPRR
Built 2021
IH 35 NBML over UPRR
Built 2022
IH 35 NB FR over UP RR
Built 2018
FORREST TURNAROUND over IH 35
Built 2021
IH 35 NBML over MLK BLVD
Built 2022
IH 35 NB over MLK BLVD ENTRANCE RAMP
Built 2022
IH 35 SBML over MLK BLVD
Built 2021
FORREST STREET over IH 35
Built 2021
ML KING JR BLVD over UPRR
Built 1974
IH 35 SBFR over Brazos River
Built 2014
Bridge Details
- Structure #
- 091610001501668
- Year Built
- 2018
- Length
- 120.4 m (395 ft)
- Max Span
- 65.5 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 3
- Daily Traffic
- 26,960
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.