LP 396 WB over IH 35
2.5 MI N OF LP 340 · County 309, Texas · Built 1964 · 3 Lanes · 595 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.550178, -97.271897
This bridge is in worse condition than 90.8% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 62 years old.
Nearby Bridges
Speegleville Rd. over SH 6
Built 2004
SH 6 over Speegleville Creek
Built 1963
SH 6 over Trib Davis Branch
Built 1932
SH 6 over Davis Branch
Built 1932
SPEEGLEVILLE RD N over SPEEGLEVILLE CREEK
Built 1960
SPEEGLE ROAD over BRANCH SPEEGLEVILLE CRK
Built 1970
SPEEGLE ROAD over SPEEGLEVILLE CREEK
Built 1970
SAN ANN ROAD over DAVIS BRANCH
Built 1972
RANDY DRIVE over BRANCH SPEEGLEVILLE CRK
Built 2009
SAN ANN ROAD over SPEEGLEVILLE CREEK
Built 2022
Bridge Details
- Structure #
- 091610001501218
- Year Built
- 1964
- Length
- 66.4 m (217.8 ft)
- Max Span
- 19.2 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 3
- Daily Traffic
- 595
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,600,000
- Total Project Cost
- $2,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.