IH 35 SB over New Rd
1.2 Mi N of SH 6 · County 309, Texas · Built 1964 · 3 Lanes · 36,974 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.508242, -97.143075
This bridge is in worse condition than 90.8% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 62 years old.
Nearby Bridges
OLD ROBINSON ROAD over COTTONWOOD CREEK
Built 1988
IH 35 SB over IRVING LEE ST
Built 1964
IH 35 ML & SBFR over Primrose Creek
Built 1964
IH 35 NB over IRVING LEE ST
Built 1964
SH 6 SB (LP 340) over OLD ROBINSON ROAD
Built 2018
SH 6 NB (LP 340) over OLD ROBINSON ROAD
Built 2018
SH 6/ LP340 WBFR over IH 35
Built 2006
US 77 over Tributary Bullhide Creek
Built 1932
US 77 over Cottonwood Creek
Built 1931
Bus 77 ML over Primrose Creek
Built 1931
Bridge Details
- Structure #
- 091610001501213
- Year Built
- 1964
- Reconstructed
- 1997
- Length
- 53.3 m (174.9 ft)
- Max Span
- 15.2 m
- Width
- 18.3 m (60 ft)
- Lanes
- 3
- Daily Traffic
- 36,974
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $700,000
- Total Project Cost
- $1,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.