US 77 BUSINESS NB over BRAZOS RIVER
0.5 MI N OF FM 434 · County 309, Texas · Built 1961 · 3 Lanes · 4,853 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.557431, -97.119036
This bridge is in worse condition than 90.8% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 65 years old.
Nearby Bridges
IH 35 NBML over BRAZOS RIVER
Built 2022
IH 35 SBML over BRAZOS RIVER
Built 2021
IH 35 NBFR over Brazos River
Built 2014
IH 35 SBFR over Brazos River
Built 2014
IH 35 SBML over MLK BLVD
Built 2021
IH 35 NB over MLK BLVD ENTRANCE RAMP
Built 2022
IH 35 NBML over MLK BLVD
Built 2022
IH 35 SBML over UNIVERSITY PARKS DRIVE
Built 2021
IH 35 NBML over UNIVERSITY PARKS DRIVE
Built 2022
ML KING JR BLVD over UPRR
Built 1974
Bridge Details
- Structure #
- 091610001410171
- Year Built
- 1961
- Length
- 271.6 m (891.1 ft)
- Max Span
- 49.4 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 3
- Daily Traffic
- 4,853
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,300,000
- Total Project Cost
- $6,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.