US 77 BUS NB over S MLK Jr Blvd

0.2 Mi N of Brazos River · County 309, Texas · Built 1961 · 2 Lanes · 4,853 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
091610001410169
Year Built
1961
Length
73.2 m (240.2 ft)
Max Span
17.1 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
4,853
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$900,000
Total Project Cost
$1,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.