US 77 BUS NB over UPRR
0.4 Mi SE of IH 35 · County 309, Texas · Built 1958 · 3 Lanes · 5,904 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
26.195794, -97.680083
This bridge is in worse condition than 90.8% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 68 years old.
Nearby Bridges
LP 499 over ARROYO COLORADO
Built 1978
FM 106 over DRAINAGE DITCH
Built 1979
BUS 77 over Arroyo Colorado
Built 1947
LP 499 over DRAINAGE DITCH
Built 1976
MATZ AVE over DRAINAGE DITCH
Built 1992
GRIMES AVENUE over DRAINAGE DITCH D
Built 1991
US 77 NB over F ST
Built 2005
US 77 SB over F ST
Built 2004
US 77 NBFR over ARROYO COLORADO
Built 1957
US 77 NB over FM 1479/ARROYO COLORADO
Built 2005
Bridge Details
- Structure #
- 091610001410125
- Year Built
- 1958
- Length
- 89.9 m (294.9 ft)
- Max Span
- 28.3 m
- Width
- 12.8 m (42 ft)
- Lanes
- 3
- Daily Traffic
- 5,904
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,100,000
- Total Project Cost
- $1,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.