SH 171 over MITCHELL GROVE BRANCH
1.5 MI N OF SH 31 · County 217, Texas · Built 1940 · 2 Lanes · 2,545 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
31.867094, -96.811242
This bridge is in worse condition than 60.5% of bridges in County 217. The average bridge in Texas is 0 years old; this one is 86 years old.
Nearby Bridges
FM 2114 over TRIB POST OAK CREEK
Built 1961
FM 2114 over POST OAK CREEK
Built 1961
SH 171 over POST OAK CREEK
Built 1940
SH 31 ML & EB Exit over North Fork Pin Oak Creek
Built 2021
SH 31 WBML over E CONNECTOR ROAD
Built 2021
CR 3323 over ASH CREEK BRANCH
Built 2002
SH 31 EBML over E CONNECTOR ROAD
Built 2021
SH 31 WBML over CR 3363
Built 2021
SH 31 EBML over CR 3363
Built 2021
SH 31 WBML over SH 171
Built 2021
Bridge Details
- Structure #
- 091100041802034
- Year Built
- 1940
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,545
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $200,000
- Total Project Cost
- $400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.