FM 934 over IH 35E
5.9 MI NE OF IH 35W · County 217, Texas · Built 2020 · 4 Lanes · 555 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
32.10475, -97.010211
This bridge is in worse condition than 34.5% of bridges in County 217. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
IH 35E over Trib of White Rock Creek
Built 2021
IH 35 E SB over White Rock Creek
Built 2021
IH 35E NB over White Rock Creek
Built 2021
CR 4333 over WHITE ROCK CREEK
Built 2007
US 77 over WHITE ROCK CREEK
Built 1931
IH 35E over BR OF WHITE ROCK CREEK
Built 2021
IH 35E over RICHLAND CREEK
Built 2006
DUKE ROAD over RICHLAND CREEK TRIBUTARY
Built 2008
FM 1243 over TRIB RICHLAND CREEK
Built 1950
FM 934 over TRIB RICHLAND CREEK
Built 1958
Bridge Details
- Structure #
- 091100004809533
- Year Built
- 2020
- Length
- 58.5 m (191.9 ft)
- Max Span
- 29.3 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 555
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.