PECOS ST over SH 81
2.5 MI SE OF IH 35 · County 217, Texas · Built 1952 · 2 Lanes · 437 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
32.022369, -97.126147
This bridge is in worse condition than 90.8% of bridges in County 217. The average bridge in Texas is 0 years old; this one is 74 years old.
Nearby Bridges
ITASCA ROAD over BOND CREEK
Built 2013
NORTH PECOS STREET over PECAN CREEK
Built 1960
SH 81 SB over PECAN CREEK
Built 1952
SH 81 NB over PECAN CREEK
Built 1952
MILFORD STREET over PECAN CREEK
Built 1985
SH 171 over BOND CREEK
Built 1979
SH 171 over PECAN CREEK
Built 1979
SH 171 over LITTLE HACKBERRY CREEK
Built 1979
ABBOTT STREET over DRAW
Built 1990
CR 4230 over BOND CREEK
Built 2023
Bridge Details
- Structure #
- 091100001406094
- Year Built
- 1952
- Length
- 39 m (128 ft)
- Max Span
- 19.2 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 437
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $1,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.