RAILROAD AVEUNE over GRUBBS BRANCH
0.25 MI W OF US 281 · County 193, Texas · Built 1940 · 2 Lanes · 222 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.981717, -98.038378
This bridge is in worse condition than 58.8% of bridges in County 193. The average bridge in Texas is 0 years old; this one is 86 years old.
Nearby Bridges
FIRST STREET over GRUBBS BRANCH
Built 2007
US 281 over BOSQUE RIVER
Built 1942
US 281 over BOSQUE RIVER RELIEF
Built 1942
ELM STREET over NORTH BOSQUE RIVER
Built 1920
US 281 over TRIB N BOSQUE RIVER
Built 1938
CR 133 over NORTH BOSQUE RIVER TRIB
Built 2003
ELM STREET over NORTH BOSQUE RIVER REL
Built 1920
SH 6 over JACK BRANCH
Built 1934
IREDELL STREET over JACKS HOLLOW CREEK
Built 1931
SH 220 over JACK HOLLOW CREEK
Built 1942
Bridge Details
- Structure #
- 090980C00203001
- Year Built
- 1940
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 222
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.