CR 345 over TRIBUTARY OF POND CREEK

1.42 MI SE FM 431 · County 145, Texas · Built 2019 · 2 Lanes · 36 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
090740AA0345001
Year Built
2019
Length
19.8 m (65 ft)
Max Span
19.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
36
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.