FM 712 over BRAZOS RIVER

2.70 MI NE OF FM 2027 · County 145, Texas · Built 1976 · 2 Lanes · 502 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
090740263401002
Year Built
1976
Length
213.4 m (700.1 ft)
Max Span
26.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
502
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,600,000
Total Project Cost
$3,900,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.