FM 413 over BRAZOS RIVER

0.50 MI SW OF FM 1373 · County 145, Texas · Built 1955 · 2 Lanes · 428 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
090740080801008
Year Built
1955
Length
204.5 m (670.9 ft)
Max Span
39.6 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
428
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000,000
Total Project Cost
$4,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.