FM 116 over RIPSTEIN CREEK

2.88 MI N OF FM 1113 · County 099, Texas · Built 1945 · 3 Lanes · 7,803 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
090500072401002
Year Built
1945
Reconstructed
2018
Length
8.5 m (27.9 ft)
Max Span
2.4 m
Width
30.5 m (100.1 ft)
Lanes
3
Daily Traffic
7,803
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.