SH 36 over TRIB LEON RIVER

3.30 MI NW OF FM 182 · County 099, Texas · Built 1955 · 2 Lanes · 3,015 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
090500018304057
Year Built
1955
Reconstructed
2018
Length
7 m (23 ft)
Max Span
2.1 m
Width
18.2 m (59.7 ft)
Lanes
2
Daily Traffic
3,015
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.