FM 219 over GARY CREEK

6.2 MI W OF SH 6 · County 035, Texas · Built 2024 · 2 Lanes · 1,900 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 8 Very Good

Location

31.740172, -97.655214

This bridge is in worse condition than 55.1% of bridges in County 035. The average bridge in Texas is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
090180105402011
Year Built
2024
Length
35.1 m (115.2 ft)
Max Span
12.2 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
1,900
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.