TOLL BRIDGE ROAD over LAMPASAS RIVER
1.55 MI SE OF IH 35 · County 027, Texas · Built 2015 · 2 Lanes · 140 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.998942, -97.488889
This bridge is in worse condition than 40.1% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
IH 35 NBFR over LAMPASAS RIVER
Built 2011
IH 35 ML over LAMPASAS RIVER
Built 2016
IH 35 SBFR over LAMPASAS RIVER
Built 2016
TAHUAYA RD over IH 35
Built 2012
ELMER KING ROAD over LAMPASAS RIVER TRIB
Built 1996
IH 35 over Skinner Branch
Built 2017
TOLL BRIDGE ROAD over LAMPASAS RIVER TRIB
Built 1980
SHANKLIN RD over IH 35
Built 2012
SHANKLIN RD over SKINNER BRANCH
Built 1962
IH 35 over Amity Branch
Built 2017
Bridge Details
- Structure #
- 090140D00472002
- Year Built
- 2015
- Length
- 62.5 m (205.1 ft)
- Max Span
- 39.6 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 140
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $510,000
- Total Project Cost
- $638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.