PADDY HAMILTON RD over SHAW BRANCH
0.40 MI NE OF US 190 FR · County 027, Texas · Built 1939 · 2 Lanes · 1,141 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
31.071486, -97.578436
This bridge is in worse condition than 74.5% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 87 years old.
Nearby Bridges
US 190 WBFR over SOUTH NOLAN CREEK RELIEF
Built 1977
US 190 WBFR over SOUTH NOLAN CREEK
Built 1977
IH 14 ML & EB FR over Branch of S Nolan Creek
Built 1976
US 190 WBML over SOUTH NOLAN CREEK (EAST)
Built 1941
US 190 WBML over SOUTH NOLAN CREEK RELIEF
Built 1941
US 190 EBML over SOUTH NOLAN CREEK (EAST)
Built 1977
US 190 EBML over SOUTH NOLAN CREEK RELIEF
Built 1977
US 190 EBFR over SOUTH NOLAN CREEK RELIEF
Built 1977
US 190 EBFR over SOUTH NOLAN CREEK
Built 1977
PADDY HAMILTON RD over US 190
Built 1977
Bridge Details
- Structure #
- 090140AA0615002
- Year Built
- 1939
- Length
- 7 m (23 ft)
- Max Span
- 3 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,141
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.