ROYAL STREET over SMITH BRANCH
1.20 MI E OF FM 2268 · County 027, Texas · Built 1987 · 2 Lanes · 609 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.941833, -97.51845
This bridge is in worse condition than 74.5% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
FM 2268 over SMITH BRANCH
Built 1957
FM 2268 over SALADO CREEK
Built 1922
FM 2268 over CAMPBELL BRANCH
Built 2021
IH 35 NBFR over SALADO CREEK
Built 2015
IH 35 ML over SALADO CREEK
Built 2015
THOMAS ARNOLD RD over IH 35
Built 2015
IH 35 SB FR over SALADO CREEK
Built 2016
IH 35 over CAMPBELL BRANCH
Built 2016
IH 35 NBFR over IH 35 NB OFF-RAMP
Built 2016
WEST VILLAGE ROAD over NO NAME CREEK
Built 2011
Bridge Details
- Structure #
- 090140AA0463001
- Year Built
- 1987
- Reconstructed
- 1990
- Length
- 34.1 m (111.9 ft)
- Max Span
- 16.8 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 609
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $419,000
- Total Project Cost
- $523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.