PRAIRIE DELL CHRCH over SALADO CRK BRANCH
0.70 MI SW OF IH 35 FR · County 027, Texas · Built 1978 · 2 Lanes · 65 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.878519, -97.581453
This bridge is in worse condition than 74.5% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
IH 35 SBML over HILL RD
Built 2009
IH 35 over PRAIRIE DELL CREEK
Built 2009
IH 35 NBML over HILL RD
Built 2008
IH 35 over MITCHELL BRANCH
Built 2017
HACKBERRY RD over IH 35
Built 2009
SOLANA RANCH ROAD over SALADO CREEK BRANCH
Built 2000
IH 35 over KILLINGSWORTH BRANCH
Built 2009
KUYKENDALL BR ROAD over SALADO CREEK BRANCH
Built 2002
FM 2115 over SOUTH DARRS CREEK
Built 1955
FM 2115 over BRANCH OF SALADO CREEK
Built 1955
Bridge Details
- Structure #
- 090140AA0451001
- Year Built
- 1978
- Length
- 10.1 m (33.1 ft)
- Max Span
- 3 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 65
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.