SH 53 over COTTONWOOD CREEK RELIEF

0.12 MI E OF FM 3117 · County 027, Texas · Built 1961 · 2 Lanes · 5,094 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
090140023201021
Year Built
1961
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
5,094
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$291,000
Total Project Cost
$437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.