FM 3423/INDIAN TRL over BRANCH OF S NOLAN CREEK

10.1 MI E OF CORYELL C/L · County 027, Texas · Built 1973 · 3 Lanes · 19,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
090140023103081
Year Built
1973
Length
7.6 m (24.9 ft)
Max Span
2.4 m
Width
25.1 m (82.3 ft)
Lanes
3
Daily Traffic
19,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.