US 190 WBML over SOUTH NOLAN CREEK RELIEF

1.47 MI E OF FM 3423 · County 027, Texas · Built 1939 · 3 Lanes · 26,140 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
090140023103022
Year Built
1939
Reconstructed
1970
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
26,140
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$348,000
Total Project Cost
$522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.