57TH ST. N. U-TURN over IH 35

0.74 MI. NE OF SH 36 · County 027, Texas · Built 2019 · 1 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
090140001514693
Year Built
2019
Length
68 m (223.1 ft)
Max Span
34.4 m
Width
10.7 m (35.1 ft)
Lanes
1
Daily Traffic
200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.