IH 35 NB ML over Pepper Crk/U-turns

1.35 MI NE OF FM 93 · County 027, Texas · Built 1977 · 3 Lanes · 66,808 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
090140001514372
Year Built
1977
Length
57.9 m (190 ft)
Max Span
15.2 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
66,808
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$696,000
Total Project Cost
$1,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.