E NORTH 10TH ST over RAINY CREEK TRIBUTARY

2.40 MI E OF BUS US 83 · County 441, Texas · Built 2023 · 5 Lanes · 4,808 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
082210B11293013
Year Built
2023
Length
26.3 m (86.3 ft)
Max Span
2.4 m
Width
23.6 m (77.4 ft)
Lanes
5
Daily Traffic
4,808
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.