US 83/US 84 NB over FM 204

2.2 MI S OF FM 707 · County 441, Texas · Built 2022 · 2 Lanes · 4,543 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
082210003401092
Year Built
2022
Length
91.4 m (299.9 ft)
Max Span
30.5 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
4,543
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.