BUS LOOP 20 (R) over PINE ST
3.15 MI E OF US 83 · County 441, Texas · Built 1960 · 4 Lanes · 10,940 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.448558, -99.733092
This bridge is in worse condition than 94.8% of bridges in County 441. The average bridge in Texas is 0 years old; this one is 66 years old.
Nearby Bridges
BUS LOOP 20 R over Southern Switching RR
Built 1951
BUS LOOP 20 R over CEDAR CREEK
Built 1951
E SOUTH 7TH ST over CEDAR CREEK
Built 2024
E NORTH 7TH ST over CEDAR CREEK
Built 1953
SH 36 over Cedar Creek
Built 1927
SH 36 over Cedar Creek Relief
Built 1927
NORTH 3RD ST over CAT CLAW CREEK
Built 1955
E NORTH 10TH ST over CEDAR CREEK
Built 1958
NORTH 6TH ST over CAT CLAW CREEK
Built 1953
US 83 BUS (D) over DRAW
Built 1949
Bridge Details
- Structure #
- 082210000618243
- Year Built
- 1960
- Length
- 18.6 m (61 ft)
- Max Span
- 9.1 m
- Width
- 21.2 m (69.6 ft)
- Lanes
- 4
- Daily Traffic
- 10,940
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $370,000
- Total Project Cost
- $555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.