FM 2408 over DRAW
0.10 MI E OF SH 6 · County 417, Texas · Built 1959 · 2 Lanes · 100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.544197, -99.160089
This bridge is in worse condition than 54.5% of bridges in County 417. The average bridge in Texas is 0 years old; this one is 67 years old.
Nearby Bridges
SH 6 over POST OAK CREEK BRANCH
Built 1957
SH 6 over DRAW
Built 1926
FM 601 over HUBBARD CREEK
Built 1930
FM 880 over DRAW
Built 1926
FM 880 over POST OAK CREEK
Built 1989
FM 2408 over BATTLE CREEK
Built 1945
SH 6 over Eubanks Creek
Built 1927
FM 2408 over DRAW
Built 1945
US 283 over BRAZOS RIVER RELIEF
Built 1929
SH 6 over BATTLE CREEK
Built 2021
Bridge Details
- Structure #
- 082090228601007
- Year Built
- 1959
- Length
- 9.4 m (30.8 ft)
- Max Span
- 3 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.