Sh 208 over Salt Fork Brazos River

2.95 MI N Of US 380 · County 263, Texas · Built 2023 · 2 Lanes · 161 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

33.207258, -100.746503

This bridge is in worse condition than 48.5% of bridges in County 263. The average bridge in Texas is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
081320201102007
Year Built
2023
Length
185.3 m (607.9 ft)
Max Span
45.7 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
161
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.