FDR 200 over BRIAR CREEK
10.3 MI S OF US190 · County 471, Texas · Built 2000 · 1 Lanes · 60 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
30.624036, -95.37675
This bridge is in worse condition than 63.9% of bridges in County 471. The average bridge in Texas is 0 years old; this one is 26 years old.
Nearby Bridges
FDR 200 over BOSWELL CREEK
Built 1996
FOUR NOTCH RD over BOSWELL CREEK
Built 2024
FDR 200 over BRANDY CREEK
Built 2012
FM 1375 over WINTERS BAYOU
Built 1960
HARDY BOTTOM RD over WINTERS BAYOU
Built 2003
FM 1375 over GOURD CREEK
Built 1960
FM 2693 over WINTERS BAYOU RELIEF
Built 1990
FM 2693 over WINTERS BAYOU
Built 1990
FOUR NOTCH RD over WINTERS BAYOU
Built 1983
CEMETERY RD over GOURD CREEK
Built 2000
Bridge Details
- Structure #
- 081304000003039
- Year Built
- 2000
- Length
- 12.2 m (40 ft)
- Max Span
- 11 m
- Width
- 4.6 m (15.1 ft)
- Lanes
- 1
- Daily Traffic
- 60
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $400,000,000
- Total Project Cost
- $400,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.