IH 20 over SPRINGS DRAW

0.3 MI SW OF FM 2699 · County 227, Texas · Built 1938 · 8 Lanes · 21,208 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
081150000505025
Year Built
1938
Reconstructed
1957
Length
10.4 m (34.1 ft)
Max Span
1.8 m
Lanes
8
Daily Traffic
21,208
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$41,000
Total Project Cost
$52,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.