RIO CONCHO DR over NORTH CONCHO RIVER
0.10 MI E OF PARK DR · County 451, Texas · Built 1963 · 2 Lanes · 3,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
31.461531, -100.430994
This bridge is in worse condition than 79.4% of bridges in County 451. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
S OAKES ST over NORTH CONCHO RIVER
Built 1930
CHADBOURNE ST over NORTH CONCHO RIVER
Built 1963
RIO CONCHO DR over NORTH CONCHO RIVER
Built 1963
US 87 NB over NORTH CONCHO RIVER
Built 1965
US 87 SB over NORTH CONCHO RIVER
Built 1967
US 67 NB EXIT RAMP over US 67 NB ENTRANCE RAMP
Built 1999
US 67 NB over OAKES STREET
Built 1999
US 67 SB over OAKES STREET
Built 1999
US 67 SB ENTR RAMP over US 67 SB EXIT RAMP
Built 1999
US 67 NB over CHADBOURNE ST
Built 1999
Bridge Details
- Structure #
- 072260B02595022
- Year Built
- 1963
- Length
- 77.1 m (253 ft)
- Max Span
- 12.8 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 3,200
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $29,000
- Total Project Cost
- $36,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.