JUNIUS ST-19TH ST over N CONCHO RI & N RIVER RD
0.80 MI SW OF US 87 · County 451, Texas · Built 1972 · 4 Lanes · 5,420 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
31.470853, -100.466758
This bridge is in worse condition than 79.4% of bridges in County 451. The average bridge in Texas is 0 years old; this one is 54 years old.
Nearby Bridges
W 14TH ST over NORTH CONCHO RIVER
Built 1935
EDMUND BLVD-W 29TH over NORTH CONCHO RIVER
Built 1962
VAN BUREN STREET over US 67
Built 2003
JEFFERSON STREET over US 67
Built 2002
19TH ST over DRAINAGE DITCH
Built 1968
US 87 NB over DRAINAGE DITCH
Built 1968
17TH ST over DRAINAGE DITCH
Built 1968
HOWARD STREET over US 67
Built 2003
15TH ST over DRAINAGE DITCH
Built 1968
14TH ST over DRAINAGE DITCH
Built 1967
Bridge Details
- Structure #
- 072260B01780001
- Year Built
- 1972
- Length
- 99.7 m (327.1 ft)
- Max Span
- 12.5 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 5,420
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $31,000
- Total Project Cost
- $39,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.